I’m a little behind schedule, well my ‘hoped schedule’, by three quarters of a day. I have 4 bonnets drying and 2 bonnets getting wired as of this afternoon.
The slight delay is a combination of the freak weather causing yesterday’s errands to take longer, one cranky bonnet giving me symmetry issues and the silly notion that I would throw a Marie Stuart into the mix.
Here is the batch drying – A mix of eras including a 50s commission, late 50s/early 60s, and two 80s, one from an advert and the other an original.









Leave a comment